A full repaint means the body of the house, the trim, the fascia and soffits, and the doors, including the garage door. The painter you are matched with does the work; Herriman House Painters, as a referral service, only makes the introduction. This page follows the job one working day at a time and then answers when in the year exterior paint can go on.
Before day one: the scope you want in writing
A painter walks the house and measures the paintable area. Pricing follows that area, the siding and the height, as the cost page shows. What you want from the walk-around is a written scope that names:
- the washing method and the drying time allowed after it
- scraping, sanding and wood repair, and who does the repair
- caulking and primer
- the product line, the number of coats, and the sheen on walls and on trim
- the colors, and who buys the paint
If the house has an association, add its approval to the list before anything is ordered. See colors and HOA approval.
Prep days: washing, scraping, caulk, primer
Sherwin-Williams says to pressure-wash to remove dirt, mildew and loose paint, then allow at least 24 to 48 hours for the house to dry before painting. Chalky or faded surfaces need cleaning down to a sound face or the new coat will not hold. Wood and stucco take longer to dry than metal or vinyl, so those walls set the schedule.
After the wash comes the work nobody photographs. Loose paint is scraped and the edges are feathered by sanding. Glossy old paint is dulled so the new coat can grip. Failed caulk is dug out and replaced at butt joints, corners and around window and door trim. Sherwin-Williams says not to caulk the lap joints of siding because they let moisture out from behind the wood. Bare wood, brick or stucco gets exterior primer to help the paint stick. Caulk has to dry before it is painted.
Rotten trim and split boards are carpentry, not painting. Ask whether the painter handles that or whether it is priced separately.
If the house was built before 1978, read the rules and approvals page before any scraping starts. A paid painter who disturbs more than 20 square feet of exterior paint on a house built before 1978 must be lead-safe certified, and replacing a window or demolishing any painted surface, such as tearing out rotten painted trim, is covered whatever its size. That certification gets settled first.
When in the year exterior paint can go on
Weather limits set the calendar, not the date.
- Temperature. Sherwin-Williams' general guidance is to avoid painting below 50°F or above 90°F.
- Low-temperature products. The same company says its Duration, Resilience, SuperPaint and A-100 exterior paints can be applied down to 35°F, against the usual 50°F for latex.
- The 48 hours after. It says the temperature should stay above the dew point for at least 48 hours after application and in the product's range, or the paint's life is shortened.
- Rain. Exterior paint typically needs at least 24 hours to fully cure before rain, and the company advises waiting a minimum of one day after a heavy rain so the surface can dry.
- Dew. It warns that dew forms as soon as the sun goes down and can get into uncured paint, causing staining and adhesion trouble even when the daytime temperature was fine.
In a valley with hot, dry summers and cold winters, those limits sort the year. Winter days that stay below the product's minimum are out. On a hot day a sun-baked wall can pass the upper limit, so a careful painter follows the shade around the house. In spring and fall the overnight low can be the problem even when the afternoon looks fine. Ask your painter what temperature and weather limits they work within, which product line they plan to use, and what happens to the schedule if it rains.
Paint days
Trim and doors usually go first, then walls from the top down. Sherwin-Williams recommends two coats. Large walls are often sprayed and back-brushed or back-rolled; narrow lap siding is often brushed. Sherwin-Williams says satin or semi-gloss suits trim and doors, while flat finishes can go on large wall surfaces. Masking protects windows, roofing, lights and plants, and drop cloths go over decks, beds and walks. A good painter starts walls once the morning dew is gone and stops early enough for the paint to set before sunset.
The walk-through
At the end, walk every side of the house with whoever ran the job. Mark misses, drips, thin spots ("holidays") and overspray. Ask for the leftover paint labeled with color and product.
What can go wrong, and why
- Peeling when paint goes over dirt, chalk or gloss.
- Frosting, streaks or staining from cold nights and dew on fresh paint.
- Lap marks from painting in direct sun.
- Cracked paint over caulk that was still wet.
- Fading on walls that take the most sun. Today's Homeowner says UV rays pose the greatest threat to a paint job, with prolonged exposure leading to fading.
Common questions
How long will a repaint last?
Sherwin-Williams says exterior paint may last 7 to 10 years, depending on climate, surface and paint quality. Details by siding are on the cost page.
What should you ask a contractor?
Ask whether the company is licensed in Utah and under which classification, whether your house is pre-1978 and whether the firm is lead-safe certified, what exactly is included in prep, which product line and how many coats, what weather limits it works within, who buys the paint, and what any written warranty covers and for how long. Then check the license yourself.
Where these figures come from
Read in November 2026 from Sherwin-Williams' exterior painting guide and its application and surface preparation FAQs, and from Today's Homeowner. To start a repaint, call (385) 318-2760 or send the form.